Twin Cities East Data Center

 

H ouse your data in a building constructed for only one express purpose – protect the information inside. Twin Cities East Data Center is nothing less than a concrete bunker protected by earthen berms. The position it holds makes it defiant against flood, storm, attack, and prying eyes. With redundancy built into both security and infrastructure support, chances are your data will outlast everything else. While exceedingly protected, the 85,000 square foot facility also provides the highest level of flexibility anywhere: build exactly what you need and we will keep it safe.

 

Building Specifications

markerFacility

  • 85,000 sq.ft. Facility
  • Purpose-built, bunkered, single-level building with high wind-rating
  • 14’ to 28’ clear height

truckLoading

  • Two (2) loading docks with staging & storage areas

group2Management

  • On-site management & engineers

clockAmenities

  • Shared conference center
  • Shared kitchen & break room
  • Dedicated office space available
  • Shared office space available
  • Showers

graphOther

  • Energy-efficient ‘follow-me’ lighting available  in dedicated suites
  • Potential for Minnesota Data Center Sales Tax Exemption (on software, hardware, power, etc)
  • Priority diesel fuel delivery contracts

Power

Sub #1 Sub #2
Concurrently-maintained substation Available for 500+kW Customer
Up to 65 MW (medium voltage w/ on-site transforming) Up to 13 MW (medium voltage w/ on-site transforming)
Utility paralleling Utility paralleling
Self-healing grid

Electrical

  • N+1 or 2N topology
  • 50 to 250 watts per sq.ft. (2 to 15 kW per rack averages)

Cooling

  • N+1 or 2N topology
  • Customer option of:
    • In-row/overhead + containment
    • CRAC (2’ to 3’ raised floor)
    • Kyoto
    • Custom

Fire Protection

  • Dedicated Suite customer option of:
    • Wet-pipe
    • VESDA
    • Pre-action
    • Gaseous

Fiber

Century Link   
logo-enventis
logo-cogent
logo-zayo
logo-xo
logo-access
Comcast Business
TW Telecom
  • Carrier-neutral
  • Two (2) meet-me rooms
  • Abundance of dark fiber available
  • Diverse site & building entry

Disaster Avoidance

  • Not in 500 year floodplain
  • Not in proximity to railroads, chemical plants, airport takeoff/landing zones
  • Earth-bermed & bunkered for wind/tornado mitigation

Security Implements

  1. Military-grade vehicle crash barriers and gates
  2. Entry man-traps with advanced sensory technologies
  3. Three (3) zones of man-containment
  4. 24×7 manned security
  5. Bullet-resistant glass throughout
  6. Video surveillance throughout buildings & site with on-site and off-site monitoring
  7. Advanced sensory-surveillance technologies throughout
  8. Local law enforcement and SWAT team coordination
  9. Biometrics + Keycard + Code access requirements

Availabilities

  • Single cabinet to multi-megawatt deployments
  • 50 to 250 watts per sq.ft.
  • N+1 or 2N electrical
  • N+1 or 2N mechanical

 

Dedicated Space & Dedicated Infrastructure Suites

Suite Space Power Support
A (LEASED) 5000 Sq.Ft. 1.25 MW of Power 2N Electrical & N+1 Mechanical Systems
B (LEASED) 1200 Sq.Ft. 500kW of Power 2N Electrical & N+1 Mechanical Systems
C (LEASED) 1200 Sq.Ft. 500kW of Power 2N Electrical & N+1 Mechanical Systems
D Up to 35000 Sq.Ft. Up to 9 MW of Power Build-to-Suit Electrical & Mechanical Systems
E 7500 Sq.Ft. Up to 2 MW of Power Build-to-Suit Electrical & Mechanical Systems
F 5000 Sq.Ft. Up to 1.5 MWof Power Build-to-Suit Electrical & Mechanical Systems
G 2000 Sq.Ft. Up to 500kW of Power Build-to-Suit Electrical & Mechanical Systems
H 1000 Sq.Ft. Up to 250kW of Power Build-to-Suit Electrical & Mechanical Systems
I 1000 Sq.Ft. Up to 250kW of Power Build-to-Suit Electrical & Mechanical Systems

 

Shared Space & Shared Infrastructure

  • Concurrently-maintainable electrical and mechanical systems
    • 150 Sq.Ft. to 500 Sq.Ft. Cages
    • Lockable Racks
    • Half and Quarter Racks

Occupancy Lead Times

  • Dedicated space + dedicated infrastructure = 90 days for signing
  • Dedicated space + shared infrastructure =100 days from signing
  • Shared space + shared infrastructure = 30 days from signing