Protection is Central.

Twin Cities West Data Center

 

W ith redundancy built into both security and infrastructure support, chances are your data will outlast everything else. While exceedingly protected, the 30,000 square foot facility also provides the highest level of flexibility anywhere: build exactly what you need and we will keep it safe.

 

Building Specifications

markerFacility

  • 30,000 sq.ft. of data center space
  • 14 foot clear height in data center
  • Concrete construction in data center

truckLoading

  • Two (2) loading docks with staging & storage areas

group2Management

  • On-site management & engineers

clockAmenities

  • Office space and turn-key disaster recovery office space available

Power

  • Utility territory of Xcel Energy
  • 4 MW available

Electrical

  • Scalable, modular design up to 250 watts per square foot

Cooling

  • N+1 of 2N topology

Fiber

Century Link
twc-logo-business
  • Carrier-neutral
  • Dark fiber available
  • Diverse site & building entry

Disaster Avoidance

  • Not within the 200 year flood plain
  • Not in proximity of railroad tracks
  • Not under take-off, landing or flight pattern of any airport
  • Not in proximity to any chemical plants or prospective terrorist targets

Security Implements

  1. Concrete construction in data center
  2. Sub-terranean data center

Dedicated Space & Dedicated Infrastructure Suites

  • Independently demised space for each tenant and shared space available
  • Exclusive infrastructure and shared infrastructure available
Suite Space Power Support
Suite 100 1000 Sq.Ft. Up to 250kW of Power Build-to-Suit Electrical & Mechanical Systems
Suite 101 2500 Sq.Ft. Up to 250kW of Power Build-to-Suit Electrical & Mechanical Systems
Suite 102 5000 Sq.Ft. Up to 250kW of Power Build-to-Suit Electrical & Mechanical Systems

 

Shared Space & Shared Infrastructure Offerings

  • Concurrently-maintainable electrical and mechanical systems
  • Availabilities
    • 150 Sq.Ft. to2,000 Sq.Ft. Cages
    • Lockable Racks
    • Half and Quarter Racks

Occupancy Lead Times

  • Dedicated space + dedicated infrastructure = 90 days for signing
  • Dedicated space + shared infrastructure =100 days from signing
  • Shared space + shared infrastructure = 30 days from signing
IronGate Data Centers